|
Allen Engineering designed the building for this multi-million dollar press for Huston Patterson printers. Soil conditions dictated a reinforced slab supported on caissons to maintain an alignment of less than .004" |
||
|
|
|
|
|
Press Placed on Foundation |
Press Assembled According to Plan |
Installed Press in New building |
Structural Design Verification for Southern Steel , Allen Engineering verified the Structural Design on the Staircases for the Schaumburg IL Convention Center, 2005